

Key Takeaways:
Custom glass is made for one opening and one opening only. That's the whole appeal, and it's also why a bit of homework before we arrive pays off. A bathroom that's ready on time keeps the project moving and avoids a second trip.
At Pro Tech Glass, we install shower doors, enclosures, mirrors, and other glass features for homeowners across Charlotte and Union County. This checklist is what we'd tell a friend before their project starts.
Start with the surfaces. Tile, stone, and any wall finish inside the shower should be done, grouted, and cleaned up before we come out to measure. We take the measurement your glass is built from against those finished surfaces, so a wall that's still at the backer-board stage will change size once tile goes on.
The same goes for the shower curb and floor. If the curb is getting a stone cap or the floor is getting new tile, wait until it's installed. A quarter inch of tile and mortar is the difference between glass that fits and glass that doesn't.
Paint is worth finishing too. Painters working around a new glass enclosure risk drips and scuffs on hardware. If you're also planning a mirror or other pieces, our full list of custom glass services shows what we can handle in the same project.
The measurement visit goes quickly when we can reach every edge of the opening. Before we arrive:
If an old door is still hanging, leave it in place. We can measure around it and plan its removal for install day. Our shower door and enclosure services include replacements, so an existing door is never a reason to delay the visit.
Glass panels are big and heavy, and they travel on edge in padded racks rather than laid flat. The crew needs a clear route from your front door to the bathroom with no tight turns blocked by furniture. Move anything fragile out of hallways and stairwells, and plan for pets to be closed in another room.
We'll need access to a nearby outlet for tools. Good lighting in the bathroom helps too, so swap out any dead bulbs ahead of time.
Expect the bathroom to be off-limits during the install. Kids, pets, and curious visitors should stay clear of the area until the glass is set.
Glass layout follows the water. Where the shower valve and showerhead sit decides which side the door opens on, where the fixed panel goes, and how much splash the glass has to catch. If you're moving plumbing in a remodel, settle those locations with your plumber before we measure, not after.
Handheld sprayers, body jets, and rain heads all change how water travels, so tell us about them at the visit. For mirrors, let us know about any wall lights, outlets, or switches nearby. Electrical work belongs to a licensed electrician, so get any changes done before your mirror is measured.
Our crew protects the work area, but it helps to lend a hand. Roll up bath mats and runners. Take framed art and decor off the bathroom walls, since drilling tile sends small vibrations through the room.
Clear anything off the toilet tank and countertop, and close cabinet doors. If your bathroom connects to a bedroom closet, shut the closet door to keep dust out. Open a window or run the exhaust fan during the work so the room stays well ventilated.
Plenty of condos, townhomes, and older houses have just one full bath. That's workable with a bit of planning. Schedule install day for a day when a quick shower at the gym or a relative's place is easy, and ask the crew how long to wait before running water on any new silicone.
If you're still deciding where the door should swing or where a fixed panel should sit, our guide to frameless shower door placement is a useful read before the measurement visit. For a step-by-step look at the visits themselves, see what happens during a frameless shower door installation.
No. Leave the existing door up and we'll measure around it. Removing the old door and hardware is handled on install day, so you never go without a door longer than you need to.
For most shower doors, the install itself fits within one day. Plan on keeping the shower dry afterward until any silicone has cured, and the crew will give you the exact wait before they leave.
Yes. Your glass is built to the finished opening, so tile, stone, and curb caps need to be complete before the measurement. You can still reach out early to talk through design ideas.
Yes. We'll talk through timing at the measurement visit so install day lands when a backup shower is easy to arrange. Tell us it's your only bathroom and we'll factor that in.
Finished tile, settled plumbing, and a clear room do most of the work for you. Get those three right and the rest of the project moves on schedule.
When your bathroom is ready, request a free consultation and we'll book your measurement visit.
Ready to upgrade your space with custom glass solutions in the Greater Charlotte area? Fill out the form or call to request a free quote or consultation. From frameless showers to glass railings, our team is here to bring your vision to life!