Most people have never watched a frameless shower door go in. So the process can feel like a black box: someone measures, weeks pass, and then a crew shows up with a giant sheet of glass. It helps to know what each step is for.
At Pro Tech Glass, we install frameless doors and enclosures across Charlotte and Union County. Here's how a typical project moves from the first visit to your first shower behind new glass.
The first visit is all about numbers. One of our team comes out, looks at the opening, and takes precise measurements of the space where the glass will live. Walls are rarely perfectly plumb and floors are rarely perfectly level, so we measure the real opening at several points instead of trusting one tape pull.
Timing matters here. We measure against finished surfaces, which means tile and stone need to be complete before this visit. If your shower is still at the framing or backer-board stage, a visit can still help with design questions, but the measurement that the glass gets built from happens after the tile is done.
We'll also confirm the details that shape the order: door swing, hinge positions, handle placement, glass type, and hardware finish. Our custom shower doors and enclosures cover frameless, semi-frameless, and neo-angle layouts, and this is where yours gets locked in.
Each panel is made to the dimensions we took, so the gap between visits is fabrication time.
Order matters in fabrication. Cutting, hinge notches, handle holes, and edge polishing all happen first. Tempering comes last, and once a panel is tempered, nobody can cut or drill it again without shattering it. That's why the measurement has to be right, and why nothing gets trimmed on site.
From measurement to installation, plan on a timeline measured in weeks rather than days. Size, glass choice, and hardware all play into it. If you'd like to see how those same choices affect the price, our breakdown of custom shower door costs walks through glass, hardware, and labor.
The crew arrives with the finished glass and your hardware. A typical day looks like this:
Once the glass is hung, we check how the door closes and how it lines up with the fixed panels. A frameless door doesn't seal the shower shut. It's built to keep splashes where they belong, so the crew pays close attention to spacing and the clearance at the bottom of the door.
For most frameless doors, installation is a one-day job. A single door on a simple alcove can go fast. A multi-panel enclosure, a neo-angle corner, or a steam setup with a transom takes longer.
What really moves the clock is panel count, hardware complexity, and how much tile has to be drilled. Removing an old framed unit adds some time too. We'll give you a realistic picture for your layout at the measurement visit, so you can plan your day around it.
The first rule is patience. If your install uses silicone, it needs time to cure before the shower gets wet, and the crew will tell you how long to wait.
After that, a few habits keep frameless glass looking new. Squeegee the glass after each shower.
Use a non-abrasive glass cleaner instead of scouring pads or powders. Keep the bathroom fan running so moisture doesn't sit on the hardware. If a hinge ever needs adjusting, that's the kind of service covered in our shower door warranty terms, which we go over with you before the project starts.
A little prep makes install day smoother. Clear the area around the shower, give the crew a path from the door to the bathroom, and plan where your household will shower if this is your only one.
We cover all of that, room by room, in our guide to preparing your bathroom for custom glass installation.
Someone should be home at the start to let the crew in and confirm the details, and at the end to see the finished door. In between, you don't need to stand over the work, so feel free to carry on with your day.
The on-site work is usually done in one day. Larger enclosures with several panels or more complex hardware can take longer. The bigger time block is fabrication, which happens between your measurement visit and install day.
Yes. When a project is a replacement, taking out the old door and its hardware is part of install day. Let us know at the measurement visit so we can plan for it.
That's normal, and it's the reason we measure the real opening at several points. Each panel is fabricated to those numbers, and the hardware gives us room to adjust for small variations during installation.
A frameless shower door comes down to a careful measurement, a stretch of fabrication, and one focused install day. Knowing the order of things takes the guesswork out of it.